Residential solar is one of the fastest-growing sources of complaints the Contractors State License Board handles. CSLB staff reported 2,111 solar-related complaints in 2026, about 230 a month, with more than 1,000 still open as of October 6, 2026 (CSLB Legislative Committee packet, November 3, 2026). The most common allegations were energy savings misrepresentation, lack of diligence finishing the job, and financing terms that differed from what buyers expected. This page covers the rules that apply before you sign.

Licensing

Classification Solar work it covers Source
C-46 Solar Installs, modifies, maintains and repairs thermal and photovoltaic solar energy systems 16 CCR §832.46
C-36 Plumbing Equipment to heat water, including solar equipment for that purpose 16 CCR §832.36
C-53 Swimming Pool Pool construction, including solar heating equipment 16 CCR §832.53

Regulation text: CSLB 2026 Law Book; classification list: CSLB.

Batteries. In 2024 the CSLB adopted a battery energy storage rule amending 16 CCR §§810, 832.10 (C-10 Electrical) and 832.46. Under it, a C-46 contractor could install a battery only as incidental to a PV system and only up to 80 kWh. The CSLB reports that the rule's effective date has been stayed by court order pending a San Diego County Superior Court case, and it published a new proposed battery storage rulemaking in 2026 (CSLB Laws and Regulations). If your project includes a battery, ask the contractor which classification it relies on and confirm the CSLB's current position.

The Solar Energy System Disclosure Document

Since January 1, 2019, solar companies have had to give consumers the CSLB's Solar Energy System Disclosure Document before completing a sale, financing or lease of a residential solar system (CSLB Solar Requirements). Under B&P Code §7169:

  • It is printed on the front or cover page of every solar energy contract, in boldface 16-point type.
  • It must show the total cost and payments for the system, including financing costs, how and to whom to complain, and your right to cancel under §7159.
  • The contract and the disclosure must be in the same language as the oral sales presentation or the marketing materials you were given.
  • It applies to systems of at least one kilowatt and not more than five megawatts on a residential building, but not to solar installed as a standard feature on new construction.

The CSLB posts versions for contracts with a three-day and a five-day right to cancel (CSLB Solar Smart). If your contract doesn't start with this page, ask why.

The CPUC Solar Consumer Protection Guide

The California Public Utilities Commission publishes the California Solar Consumer Protection Guide. Solar providers interconnecting residential customers of PG&E, SCE, SDG&E, Bear Valley Electric Service, PacifiCorp and Liberty must collect the customer's initials and signature on it, and customers must be given time to read it before signing. Interconnection applications with contracts signed on or after December 15, 2026 must include Version 4 of the guide (CPUC). The CPUC recommends that providers give out the guide at first contact.

Solar is a home improvement

B&P Code §7151 lists solar energy systems as home improvements. The CSLB states that the home improvement contract and payment rules apply to residential solar installations (CSLB Disaster Help Center). That means:

  • A written contract with every item required by §7159 (contract rules)
  • A down payment of no more than $1,000 or 10 percent, whichever is less (§7159.5(a)(3))
  • No payment ahead of the value of work performed or materials delivered, including advance payment from a lender or financier (§7159.5(a)(5))
  • A three-day right to cancel, or five days if you are 65 or older (right to cancel)
  • A registered home improvement salesperson if someone other than the contractor's principals sold it (HIS rules)

Buy, lease or PPA

The CSLB's Solar Smart page compares the three common structures (CSLB Solar Smart):

  • Buying with cash or a loan gives you the tax credits and incentives, and you're responsible for repairs. Property-tax financing (PACE) requires a financing estimate and disclosure before you sign, and the CSLB warns such programs may place liens or require payoff before you sell or refinance.
  • Leasing usually means fixed monthly payments for a set term, and the solar company keeps the incentives. Selling your home can require a buyout or a buyer willing to assume the lease.
  • A power purchase agreement has you buy the system's power at a set rate, often with an escalator. The CSLB compares an escalator to a variable rate mortgage that goes up every year.

The CSLB's advice for all three: get every claim about savings and production in writing, read the contract before signing, and watch for clauses that let the company lien your home or accelerate payments. It also says not to let your lender pay the contractor before the work is done, and to collect lien releases from the contractor, subs and suppliers.

If something goes wrong

The CSLB has a dedicated Solar Complaint Form, online or on paper in English and Spanish (CSLB: Filing a Construction Complaint). It must also publish an annual report on solar complaints (B&P Code §7170). The state's Solar Energy System Restitution Program was repealed June 30, 2024, so recovery today runs through the usual routes in the complaint guide.

For installers, browse electricians in our directory or request quotes. For typical prices on related work, see electrical costs in California and roofing costs.

Related pages

Sources

Frequently Asked Questions

What license does a solar installer need in California?

The C-46 Solar classification covers installing, modifying, maintaining and repairing thermal and photovoltaic solar energy systems (16 CCR §832.46). Contractors in some other classifications also install solar, so confirm with the CSLB that the classification on the license covers your system, using the CSLB License Check before signing.

What is the California Solar Energy System Disclosure Document?

A CSLB form, developed with the CPUC, that a solar company must print on the front or cover page of every residential solar contract in bold 16-point type. It must show the total cost and payments including financing, how to file complaints, and your right to cancel under B&P Code §7159 (§7169).

Do I have to sign the CPUC Solar Consumer Protection Guide?

If you're a residential customer of PG&E, SCE, SDG&E, Bear Valley Electric, PacifiCorp or Liberty, your solar provider must collect your initials and signature on the guide with its interconnection application. For contracts signed on or after December 15, 2026, it must be Version 4 of the guide, according to the CPUC.

Does the down payment limit apply to solar in California?

Yes. A solar energy system on a home is a home improvement under B&P Code §7151, and the CSLB says the home improvement contract and payment rules apply to residential solar. The down payment can't exceed $1,000 or 10 percent, and payments can't run ahead of the work (§7159.5).